Breaking Travel News

Eurostar passengers warned over Channel Tunnel engineering work

Eurostar passengers warned over Channel Tunnel engineering work

Essential Eurotunnel engineering works are scheduled to take place in the Channel Tunnel this weekend, which will affect some Eurostar services.

As a result, the times for some Eurostar services have been amended from Saturday September 29th until Monday October 1st.

Passengers are requested to refer to the special timetable published on Eurostar.com to check if their departure times have changed. 

Eurostar is contacting directly affected passengers and all passengers are advised to check in as usual, at least 30 minutes before their departure time (ten minutes for Business Premier travellers and Eurostar carte blanche holders).